The Day I Almost Approved a Disaster

It was a Tuesday morning in early March. I was reviewing a purchase order for McNichols stair treads — a routine spec for a commercial shower project we were rolling out. The quote looked fine on the surface. Competitive price. Quick turnaround. The vendor even said they could do custom cut-to-size for the Schluter trim we needed around the drain pans.

But something gnawed at me.

I’ve been in quality compliance for over four years now — reviewing roughly 200 unique items annually for our facility. And the one thing that always trips you up? The fine print. The hidden extras. The costs that don’t show up until the invoice lands.

So I did what I always do. I asked: “What’s NOT included in this price?”

The First Red Flag

The sales rep was polite but evasive. “Our quote covers the materials,” he said. I pressed. “Custom fabrication for the stair treads? The Schluter edge profiles? Delivery to site?”

Silence on the other end.

Then the truth came out. Custom cuts were extra. Delivery was extra — and not just shipping, but a 15% surcharge for residential-class access. The Schluter trim? They didn’t even stock the profile we specified. They’d subcontract it, adding a markup and lead time of 10 business days.

Total cost? Pretty much double the original quote. Not great. Not terrible. Just… deceptive.

Why I’m Glad I Waited

I had two hours to decide before the rush processing window closed. Normally I’d get three comparable quotes, but with the project deadline breathing down my neck, I almost approved it. In hindsight, I should have pushed back harder on the timeline. But with the ops manager waiting, I made the call to reject the batch and spend the afternoon getting real numbers.

So glad I did.

I reached out to McNichols Co. directly — something I should have done first, honestly. Their rep listed every line item: material cost, custom fabrication fees, delivery, even the Schluter trim at a fixed unit price. The total looked higher on paper, but when I added up the other vendor’s hidden charges, McNichols was actually cheaper. Way cheaper. And they quoted a 4-week lead time — not 6 to 8.

Dodged a bullet there.

The Windows Update That Saved Me

Funny thing: when I was building the comparison spreadsheet, a Windows update error popped up — the dreaded “0x800f0922” — and my system hung. For 20 minutes. I was cursing the IT gods. But during that forced break, I re-read the first vendor’s terms. Found a clause about “additional handling fees for specialty items” buried in page 7. That clause applied to both the stair treads and the Schluter trim.

If that update hadn’t locked me out, I’d have approved the PO without seeing that clause. Seriously — I’m not 100% sure the update was intentional, but it saved me probably $2,800 in hidden fees on a $18,000 project.

What I Learned About Transparency

I’m not a logistics expert, so I can’t speak to carrier optimization. What I can tell you from a procurement perspective is: the vendor who lists all fees upfront — even if the total looks higher — usually costs less in the end.

Take it from someone who reviews 200+ items a year. The cheapest quote is rarely the final price. Here’s what you need to know:

“I’ve learned to ask ‘what’s NOT included’ before ‘what’s the price.’”

Three things to check before signing:

1. Custom fabrication. Is cut-to-size included? If not, get a per-piece rate. For stair treads, that can add 15–30% to the unit cost.

2. Delivery surcharges. Residential, rural, or jobsite access fees. I’ve seen 20% surcharges for “non-commercial delivery zones.”

3. Specialty items. Things like Schluter trim, non-stock colors, or custom perforations. Vendors often subcontract these. Ask exactly how they’re priced and who owns the lead time risk.

Bottom Line

This approach worked for us, but our situation was a mid-size commercial project with predictable specs. If you’re dealing with a complex retrofit or international logistics, the calculus might be different. I can only speak to domestic operations.

But one thing I’ll stand by: transparency builds trust. The vendor who shows every line item — even when it makes the total look higher — is the one I’ll call first next time.

Not because it’s cheaper on paper. Because I know exactly what I’m paying for. And that peace of mind? It’s worth more than a low quote ever will be.

Prices as of March 2025; verify current rates with vendors.

Jane Smith avatar
Jane Smith

I’m Jane Smith, a senior content writer with over 15 years of experience in the packaging and printing industry. I specialize in writing about the latest trends, technologies, and best practices in packaging design, sustainability, and printing techniques. My goal is to help businesses understand complex printing processes and design solutions that enhance both product packaging and brand visibility.

Leave a Reply

More Articles